Physiotherapy Clinic Case Study

How I Grew Aarogya Physiotherapy Clinic Using a Local SEO Strategy

From May 2025 and October 2025, we implemented a focused Local SEO strategy that helped Aarogya Physiotherapy Clinic achieve 464 total interactions and 118 direct calls from Google.

Client: Govind Jha
118 Direct Patient Calls
Aarogya Physiotherapy Clinic GBP progress report screenshot

Key Results

118 Direct Patient Calls

464 total Google interactions

When Aarogya Physiotherapy Clinic first approached me, their Google visibility was limited, and patient inquiries were inconsistent.

They relied mostly on walk-ins and word-of-mouth referrals. The goal was clear — improve their Google Business Profile visibility and increase leads through local search.

Between May 2025 and October 2025, we implemented a focused Local SEO strategy that helped Aarogya Physiotherapy Clinic achieve 464 total interactions and 118 direct calls from Google.

Step 1: Setting the Foundation — Optimizing Google Business Profile (GBP)

The first step was to ensure the clinic’s GBP was fully optimized.

Actions Taken:

  • Updated business name, address, and phone number (NAP) for consistency across directories.
  • Added complete business categories (e.g., Physiotherapy Clinic, Rehabilitation Center, Sports Injury Clinic).
  • Wrote a compelling business description, including keywords like physiotherapy in [city] and rehab specialists near me.
  • Uploaded high-quality images of the clinic, staff, and facilities.
  • Enabled features like chat, bookings, and call tracking.

Result:

Within the first two months, Google recognized the listing as “Active” in the local pack — improving visibility in “near me” searches.

Step 2: Collecting Reviews and Building Trust

We launched a review generation campaign to strengthen social proof.

Actions Taken:

  • Encouraged satisfied patients to leave Google reviews after each appointment.
  • Responded to every review — both positive and negative — within 24 hours.
  • Added keywords naturally in responses (e.g., “Thank you for visiting our physiotherapy center in [city]!”).

Result:

  • The clinic’s average rating increased.
  • Google rewarded the listing with better local ranking visibility due to high engagement and review frequency.

💡 Pro Tip: Responding to reviews signals to Google that your business is “alive and engaging,” improving your map ranking.

Step 3: Content and Local Keywords

We focused on local content SEO to drive nearby traffic.

Actions Taken:

  • Created location-based service pages like “Back Pain Therapy in [City]” and “Sports Injury Physiotherapy near [Area Name].”
  • Published Google Posts weekly about recovery tips, exercises, and success stories.
  • Added FAQs and “before-and-after” visuals for better engagement.

Result:

Patients searching for nearby physiotherapy services started finding Aarogya Physiotherapy Clinic directly in Google Map Pack results.

Step 4: Tracking & Performance Analysis

After 6 months, here’s what Google Business Profile data showed:

MetricMay 2025 - Oct 2025Growth Impact

Total Business Profile Interactions

464

↑ 65% increase in engagement

Calls from Profile

118

↑ 80% more direct inquiries

Website Clicks

Increased steadily

More traffic from local search

Directions Requests

Grew monthly

Higher local intent to visit

Screenshot Insights:

  • 464 interactions show how actively patients engaged with the business.
  • 118 direct calls came straight from Google — real patient leads, not just clicks.

This means roughly 1 in every 4 people who interacted with the profile actually called the clinic!

Step 5: Continuous Optimization

Local SEO isn’t a one-time job — it’s about consistency.
We kept refining:

  • Updating Google Posts every week.
  • Refreshing photos monthly (clinic, team, events).
  • Monitoring insights and adjusting keywords seasonally.
  • Building local backlinks from nearby directories and health blogs.

Final Results Summary (May–Oct 2025)

464 total Google interactions

118 direct patient calls

Higher ranking for “Physiotherapy Clinic near me”

Consistent weekly appointments through Google search

Client Outcome

“Before, we barely got calls from Google. Now, most of our patients say they found us on Maps!” — Clinic Manager, Aarogya Physiotherapy Clinic

Key Takeaways

  1. Optimize your Google Business Profile before spending on ads.
  2. Encourage reviews — they act as trust magnets.
  3. Use local keywords in descriptions, posts, and website pages.
  4. Track monthly insights — numbers tell the real story.
  5. Stay consistent — Google rewards active profiles.

Pro Tip

If you manage a clinic or local service, spend 30 minutes weekly updating your Google Business Profile. Even small actions — like replying to a review or posting a photo — can push your profile up the map pack rankings.

Conclusion

Through strategic Local SEO — optimizing the profile, collecting reviews, posting relevant content, and tracking performance — Aarogya Physiotherapy Clinic became one of the top search results for physiotherapy-related searches in its area.

The 6-month growth from minimal activity to 464 interactions and 118 calls proves that even small, consistent SEO efforts can deliver real-world patients and revenue.

Client Testimonial

"Bikash is amazing SEO expert, he helped me to set up my GBP, and I am getting lot's of patients."
- Govind Jha, Owner, Aarogya Physiotherapy

Ready to Achieve Similar Results?

Let's discuss how we can create a tailored SEO strategy to grow your business.

How I Grew Aarogya Physiotherapy Clinic Using a Local SEO Strategy - Bikash Yadav SEO Case Study